BuiltFirst 3D

BuiltFirst 3D / Work / Hot work habitat

Hot work habitat, pressurized enclosure film

What it is

A pressurized hot work habitat: the sealed room a crew builds around a job so a spark can never meet gas. In 74 seconds the panels go up around a live pipe, blowers push fresh air in low and pull it out high, the room holds above outside pressure, the weld starts, and when methane reaches the high detector the shutdown cuts power to the weld and closes the air intake.

It is a concept I built on my own to show how a film explains a safety system that a photo can't. Sizes are approximate, and the pressure readout is illustrative.

How it was made

  • ModelWall panels, frame, the seal around the pipe, blowers, ducts, two gas detectors and the shutdown panel, each its own object so it can move on its own.
  • MotionThe panels arrive and lock seam by seam. Air is drawn as moving particles, in low and out high. Gas rises toward the high detector until the shutdown trips.
  • LabelsTen callouts, each tied to its part's position in every frame, so the label stays on the part while the camera moves.
  • Render1,788 frames in Blender EEVEE at 24 frames a second.
  • SoundScore and sound effects written in code. No samples, no voice; the words are on screen.
74 sfilm length
1,788frames rendered
10labeled parts
4chapters: panels, air, hot work, shutdown

Stills from the render

The habitat sealed around the pipe with the blower attached
Sealed
Habitat walls shown as glass with air moving in low and out high
The air
Gas cloud reaching the habitat as the shutdown trips
The trip

Your turn

Got something that's hard to show in a photo?

Call or text Wyatt, or send an email. Tell me what it is and what you have on it: drawings, photos, a spec sheet.

CallText Wyatt